Installation: Rules, Sequence & Key Numbers

Five rules govern a sound ASA resin roof: 660mm purlin spacing, bottom-up laying, one-wave laps, pre-drilled fixings and correctly finished ridges.

Five Installation Rules

Working Sequence

First, set out and fix the purlins at 660mm centres and check the roof plane. Second, lay main tiles from the eave upward against the wind, one wave per side lap, advancing on both slopes together. Third, pre-drill every fixing hole 2mm oversize and fix with 6.3mm self-tapping screws - never drive screws through undrilled sheet, which can crack the tile and blocks thermal expansion. Fourth, fit the main ridge after cutting its first section, then the tilted ridges, ridge ends and two-way or three-way junctions from the accessory system, sawing each ridge joint flush. Finally, walk the roof once to check laps, fixings and ridge alignment.

Key Numbers at a Glance

ItemValue
Purlin spacing660mm
Side lap1 wave
Pre-drilled hole2mm larger than the shank
Recommended screw6.3mm self-tapping
Effective width per sheet960mm

Full step-by-step guidance is in the guide How to install ASA resin roof tiles. Technical support, including layout drawings and accessory lists, is included for agents and project orders - see trade and contact.